View Reports - 85,534 found

Other at 4 Shafter St, Dorchester

I been reporting that a family at 7 shafter st is saving spots daily and you keep closing the case? Clearly you can see the same trash can savinging the same spot each time we report it. I think it sad that you don't take this complaint s...
CLOSED Case Resolved. The barrel is again on private property and I can not go onto private property and take the barrel that is mentioned, no space saver on the street. - about 1 hour ago #101002073381
Other at 4 Shafter St, Dorchester Other at 4 Shafter St, Dorchester

Other at Intersection Of Durnell Ave & Roslindale Ave, Roslindale

Subcontractor came and stripped pavement, placed new pavement and didn't clean up the leftover sand, tar, construction mess. Doesn't look like the street cleaner came through either.
CLOSED Case Resolved. Dear Constituent,. The PWD Roadway Repair Contractor is working on your street performing patch paving. It is an important city service for your neighborhood to provide the best permanent repairs of previous utility excavations or potholes. The utility work previously done on your street was left with a temporary patch. The City of Boston does not want the permanent asphalt cross section (typically 6.5" on residential street and 7.5"on main arterials) to be put back soon after the gravel down to the pipe has been disturbed. There is a possibility that settlement could occur. That?s why the City waits before performing the cross section repair. Our permanent patches hardly ever settle and that is the goal that any City or Town would want to happen regarding utility excavation work. We do have a unit that inspects backfilling and temporary patches (The Construction Inspection Unit CIU) The CIU does stay on top of the contractors and utility companies. Many of the temporary patches are in good condition. However, the key is the patch is only 3". We need the full cross section put back. Below is the steps taken to do the permanent repair. The construction process is to dig out 6.5 to 7.5" inches of material and place 5 inches of dense binder hot mix asphalt in 2 lifts. The dense binder gives the patch its strength but is has large stones and is not conducive to providing a smooth ride, the contractor usually within a week comes back and places 1.5 inches of the top course. The top course is hot mix asphalt that provides the smooth ride. In regards to your complaint we have spoken to the contractor and asked that they do a better job cleaning up the work zone at the end of the day. Sincerely,. Mark Cardarelli. Supervisor of Utility Coordination and Compliance. Boston Public Works Department. 617-635-4951 Office. - about 1 hour ago #101002072700

Other at 377 W First St, South Boston

Utility crews digging and jack hammering after 11pm
CLOSED Case Resolved. Dear Constituent,. National Grid responding to a gas leak on your street activated an emergency permit. Emergency work must be performed no matter what time of day or night in the interest of public safety and the protection of private property. This proved to be a very difficult repair, resulting in National Grid working into the night. The city apologizes for the inconvenience this necessary work caused. For any questions or concerns, please contact the number listed below. Sincerely,. Mark Cardarelli. Supervisor of Utility Coordination and Compliance. Boston Public Works Department. 617-635-4951 Office. - about 1 hour ago #101002072705

Other at 179 Harvard Ave, Allston

Dog feces on sidewalk outside this barbershop. This Happens regularly and isn't picked up.
OPENED about 1 hour ago #101002073598

Other at 111 Brayton Rd, Brighton

Yard waste bags have been out since Monday- the schedule says this week is pick up
CLOSED Case Resolved. this is today pick up , inspected yes yard waste on curb . 4/27/17. - about 1 hour ago #101002073280

Other at 76 Mount Pleasant Ave, Roxbury

BWSC Bypass pipe is leaking.
CLOSED Case Resolved. BWSC Flushed water main as part of our work. - about 2 hours ago #101002072995
Other at 76 Mount Pleasant Ave, Roxbury

Other at 44 Hartford St, 1, Dorchester

Yard waste not picked up on 4/26 although on the schedule for 4/26. Just 2 bags but can someone come?
CLOSED Case Resolved. Case resolved. Yard waste picked up on 4/27/17. - about 2 hours ago #101002073477

Other at 401 W First St, 1, South Boston

Dresser street - this is running outside windows - construction notice says 7 AM at they started this at 645
OPENED about 2 hours ago #101002073551
Other at 401 W First St, 1, South Boston

Other at 829 Beacon St

7 calls to sunrise scavenger regarding damage they caused to our dumpster with no return call. Please forward owner contact information.
OPENED about 2 hours ago #101002073543
Other at 829 Beacon St

Other at 18 Magnolia Square Dorchester

Yard waste bags not picked up at 18 Magnolia Square. Please delete duplicate ticket with wrong address
CLOSED Case Resolved. Case resolved. Yard waste picked up on 4/27/17. - about 2 hours ago #101002073426
Web_branding_watermark

Help make Boston more beautiful

BOS:311 enables real-time collaboration with citizens, 'deputizing' mobile users to become the city's eyes and ears. Citizens report potholes, graffiti, and other issues from anywhere in the city using their mobile phone.

Start Reporting

  • Android_market
  • App_store

Status

Services